Nautor Furling Installation Manual – C7475/C7550
HALYARD WRAPSThe most serious problem with furling systems occurs when the jib halyard wraps around the headstay foil. Halyard wraps will prevent fu
PENDANTSIf your sail is not long enough to position the halyard swivel prop-erly, you must add a pendant to the sail. Pendants should be plas-tic co
Corporate HeadquartersN15W24983 Bluemound Rd, Pewaukee, WI 53072 USATelephone: (262) 691-3320 • Fax: (262) 701-5780Web: www.harken.com • Email: harke
MAIN COMPONENTS Halyard Swivel C7475/C7550 Feeder, Toggle/Terminal Assembly Drum Assembly GENERAL SPECIFICATIONS Parts ListC7475C75502 Nautor
MISCELLANEOUS PARTS Red Loctite® Foil Screws Foil Wedges Torque Tube Screws 5 mm, 8 mm Allen Wrench Prefeeder Blue Loctite® Super Bonder R
HEADSTAY CUT LENGTHSubtract the following from the headstay length and cut the stay at that point. STRINGING CONNECTORS ON STAYMake sure the trim c
FOIL CUT LENGTH Foil cut length is based on pin-to-pin length as measured from center of upper pin (attaches the stay to the mast) to center of lowe
CUTTING TOP FOIL Once you have checked the top foil length, cut the top foil.Deburr and clean all shavings from the foil.Important: Failure to debur
Use Super Bonder to glue the trim cap to the roughened foil top.Slide the next connector to the top of the stay.Coat half of the connector and the in
Install feeder screws toward bottom, using blue Loctite® on screws.Slide lower unit onto foils. ATTACHING STAY TO TOGGLE/TERMINAL ASSEMBLYMake sure
Hammer the pin into the main body.Clean excess Loctite® from the terminal body. Tape around sleeve to secure pin.Lower drum assembly and slip clevis p
Comentários a estes Manuais